ROAD REPORT - Fri, Mar 27th, 7:30pm
Fri, Mar 27th, 7:30pm - ROAD REPORT: Hi @everyone. As mentioned previously, distribution of reclaimed asphalt on CDA, St. Joe, Liberty and South Hayden was completed yesterday (Thurs 3/26).
Spring cleanup continued today.
Tahoe and Newman were graded while the roller ran again over the asphalt to break down the bigger chunks as well as possible to maximize use and costs of our rental.
Tomorrow (Sat, 3/28), Priest River, Spirit Drive, and other areas will be graded and/or rolled, as needed.
Please watch out for our operators.
Folks are speeding and passing our heavy equipment even on blind turns and when our operators put their hand out to indicate vehicles should stop.
***Please wait for them to wave you by.***
Again, feel free to email with questions at roads@spiritlakeeast.org. I only ask that you read the reports first to help save time answering questions that have already been answered. Below is a link to reports in order.
https://www.spiritlakeeast.org/blog
Thanks for driving slowly to preserve our unpaved roads and keep our rural community members safe. Reminder: 15mph vs 20mph makes a big difference in keeping roads in shape as long as possible.
Have a great weekend. Jon Dore, Road Chair